The Scow Build Process in Pictures - 2/11

The following parts or assemblies have been set in position on the building jig:

  • bow transom;
  • bow tank centreline bulkhead;
  • bulkhead B and mast step assembly;
  • bulkheads C, D and E;
  • stern transom.

Previous Page

Back to Design and Construction

Next Page